Embraer E2 Flows

Embraer E2 Flows

Embraer E2 Flows


C. M.
This flashcard set provides an overview of the operational flows for the Embraer E2 aircraft, catering to pilots and aviation enthusiasts. It covers essential procedures such as pre-flight checks, taxiing, takeoff, flight, and landing, emphasizing the importance of checking panels, setting required systems, and following specific sequences. The flashcards detail steps like setting the APU, configuring lights, and performing checks on various systems, ensuring a comprehensive understanding of the aircraft's operational protocols. Pilots can use this flashcard set to familiarize themselves with the Embraer E2's procedures, enhancing their preparedness and efficiency during flights.
Cartes-fiches
11
Utilisateurs
4
Langue
Anglais
Catégorie
Culture générale
Niveau
Autres
Créé / Mis à jour
16.12.2023 / 17.12.2023

Cartes-fiches

Before Start Flow to the Line RSP

1.) Jump Seat Oxy Mask, Regulators and Audio Panel CHECK

2.) Overhead Panel SET/CHECKED

3.) Oxygen Masks & Regulators CHECK / 100%

4.) GLARESHIELD LIGHTS CONTROL Panel AS REQUIRED

5.) DISPLAY CONTROLLER Panel SET

6.) REVERSIONARY PANEL SET

7.) Flight Instruments SET/XCKD

8.) Systems STATUS Page CHECK

9.) EICAS CHECK

10.) AUDIO CONTROL Panel AS REQUIRED

11.) TRIM Panel CHECK

12.) LG WRN / GROUND PROX INHIBITS Panel CHECK

13.) Flight Controls DISCONNECT Handles CHECK

14.) ALTERNATE GEAR EXTENSION Lever CHECK

15.) MCDU SET 

Before Start Flow Below the Line RSP 

(shortly before Startup)

1.) Flight Deck Door LOCKED

2.) Window CLOSED

3.) Doors CLOSED

4.) External Lights RED BCN Switch ON

5.) Hydraulic Sys 3 ELEC PUMP A Knob ON

6.) XPDR TA/RA

After Start Flow RSP

1.) EICAS CHECK

2.) FLAPS SET

3.) FLIGHT CONTROLS CHECK

4.) APU AS REQUIRED 

Before Takeoff Flow RSP

(when cleared to line up)

1.) Cabin Crew Prepare for Departure PA ORDER

2.) STROBE lights ON

3.) Brake Temperature CHECK

4.) EICAS CHECK

5.) Transponder TA/RA

6.) Takeoff Configuration CHECK

When aircraft is lined-up, PF... 

... arms Autothrust

Cleared for Takeoff Flow RSP

1.) Landing lights ON

2.) Taxi Side ON

3.) Taxi Nose light OFF

4.) FSTN Belts CYCLE

After Takeoff Flow

(PF & PM)

PF

1.) AFTER TAKEOFF CHECKLIST ORDER

PM

1.) LANDING GEAR UP

2.) FLAPS 0

3.) APU AS REQUIRED

4.) Airconditioning & Pressurisation CHECK 

FL 100 or 10'000ft in Climb Flow

(PF & PM)

PF

1.) MCDU AS REQUIRED

PM

1.) LANDING Lights OFF

2.) TAXI and TAXI SIDE and LOGO Lights OFF

3.) FSTN BELTS AS REQUIRED

4.) STERILE Light AS REQUIRED

FL 100 or 10'000ft in Descend Flow (PM)

PM

1.) LANDING Lights ON

2.) STERILE Light ON

After Landing Sequence Flow RSP

1.) APU AS REQUIRED

2.) Strobe Lights OFF

3.) Landing Lights OFF

4.) Taxi Light ON

5.) Taxi Side Lights ON

6.) No Elec Device OFF

7.) Transponder TA/RA

8.) Slat/Flap 0

9.) PITCH Trim 2 UP SET

10.) DU 3 Status Page display

11.) DU 2 Electrical Synoptic Page display

Shut Down Flow RSP

1.) TRANSPONDER SQ 2000, then STBY

2.) SHUTDOWN CHECKLIST PERFORM

 

Étudier