MSD
FHNW - Medical Software Development
FHNW - Medical Software Development
16
0.0 (0)
Kartei Details
Karten | 16 |
---|---|
Sprache | English |
Kategorie | Informatik |
Stufe | Universität |
Erstellt / Aktualisiert | 13.06.2021 / 14.06.2021 |
Lizenzierung | Keine Angabe |
Weblink |
https://card2brain.ch/box/20210613_msd
|
Einbinden |
<iframe src="https://card2brain.ch/box/20210613_msd/embed" width="780" height="150" scrolling="no" frameborder="0"></iframe>
|
Top Risk for failure in SW Development
- Schedule (e.g. Time estimation)
- Budget (e.g. Cost overrun)
- Operational and Management (e.g. Resource planning)
- Technical (e.g. Change of requirements)
- External (e.g. Government rule change)
What are the SW Engineering knowledge areas? List 15 areas!
- SW Requirements
- SW Design
- SW construction
- SW Testing
- SW Maintenance
- SW Config Managment
- SW Engineering Management
- SW Engineering Process
- SW Engineering Methods
- SW Quality
- Common Practise
- Economics
- Computing, Mathematical and Engineering Foundations
Define Software Requirements
elicitation,negotiation, analysis, specification, andvalidation
Define SW Design
definition of the architecture, components, interfaces,