This flashcard set delves into university-level quality management, focusing on processes, systems, and compliance. It covers key concepts like quality assurance, safety management, and audit procedures, including the differences between quality control and assurance. The flashcards explore the roles of various personnel, such as quality managers, auditors, and accountable managers, and discuss the importance of documentation and procedures. This set is invaluable for students and professionals in technology fields who need to understand and implement effective quality management practices.
Cartes-fiches
48
Utilisateurs
8
Langue
Anglais
Catégorie
Technique
Niveau
Université
Créé / Mis à jour
19.02.2020 / 23.12.2020

Cartes-fiches

What are the components of a compliance monitoring program?

  • Schedule of the monitoring program
  • Audit procedures including an audit plan
  • Audit reporting
  • Follow up and corrective action monitoring (wie wird mit Befunden der Audits umgegangen?)
  • Recording system

Worin liegt der Unterscheid zwischen Inspektionen und Audits?

Inspektionen betrachten Ergebisse, Audits betrachten Prozesse

Weshalb sind Checklisten für Audits sehr wichtig?

Da Audits sehr umfangreich sein können, helfen Checklisten dabei nichts zu vergessen.

Weiter hat man so gerade Aufzeichnungen zu den durchgeführten Audits welche archiviert werden können.

What are the two types of Audit Findings?

  • Non Conformity (not documented):
    Manual provisions do not satisfy/reflect applicable regulations/standards
     
  • Non Conformity (not implemented):
    Performed activities do not comply with applicable manual provisions and/or regulations/standards

What are some of the main Auditing Methods to collect information?

Interview

Review of documents

Examination of documents

Witnessing of activities

What should an Audit Report contain?

  • Checked requirements and items
  • Description of findings (non compliances and non conformities)
    • Finding = non-conformity
      • non-conformity -> non-fulfillment of a requirement
        • requirement -> Need or expectation that is stated, generally implied or obligatory.
    • Requirement reference
    • Observed facts
    • Source of the information on facts
    • Objective evidence (documents, records, photographs, audio recordings, etc.)
       
  • Level of findings
    • 1 - safety affected (
      • Gegenmassnahmen zwingend nötig
      • Operation kann nicht fortgesetzt werden
    • 2 - safety may be affected
      • Gegenmassnahmen zwingend nötig
      • Operation kann fortgesetzt werden
    • 3 - observation / recommendation
      • Keine zwingenden Gegenmassnahmen nötig
         
  • Due date (DD) for corrective action plan (CAP)
    • To be set taking into consideration the safety impact of the finding
    • Consider to use standard DD periods for CAPs
       
  • Due dates for corrective actions
    • To be set taking into consideration the safety impact of the finding
    • Consider temporary procedure
    • Consider available resources
       
  • Allocation of responsibility for corrective action
    • Consider responsibility for affected activity
    • Consider capability/qualification

Who should the audit report be destributed to?

  • Auditee
  • Affected Postholder / NP / Manager
  • Quality/Compliance Manager
  • Accountable Manager

What is the difference between a correction and correction actions?

A correction is the act of eliminating a detected non-conformity.

A corrective action is the action of eliminating the cause of a detected non-conformity.

There are also preventive actions that eliminate potential non-conformities.