Flow Patterns E190

To learn the Flow Patterns of E190 (Helvetic)

To learn the Flow Patterns of E190 (Helvetic)


T. L.
This flashcard set covers the operational procedures and checklists for aircraft flow patterns, focusing on key actions like engine management, landing sequences, and pre-flight preparations. It delves into essential tasks such as setting transponders, managing hydraulic pumps, and following checklists for various phases of flight, including takeoff, approach, and after landing. Pilots and aviation professionals will find this set invaluable for mastering the intricate steps involved in ensuring safe and efficient flight operations, from engine startup to shutdown.
Flashcards
13
Students
1
Language
English
Category
Technology
Level
Other
Created / Updated
10.04.2019 / 08.02.2025

Flashcards

Start up approved

- Red Beacon (ON)

- Electric Hydraulic Pump 3A (ON)

- Transponder (ALT-ON)

After Start Flow

- N1 Target

- "FLAP _ SET"

- Flight Controls verifies on DU2

- APU OFF or ON

Line Up approved

- PA: "Cabin Crew, prepare for departure"

- Strobe Light (ON)

- Brake Temperature

- EICAS

- Transponder TA/RA

- Take-off Config. Button (push)

Take-off Clearance received

- LDG Lights (ON)

- Taxi Side Light (ON)

- Taxi Nose Light (OFF)

- FSTN Belts Sign (2x Cycle)

PM reports "Flaps 0"

PF: "After Take-off Checklist"

- LDG (UP)

- Flaps (UP)- AAP: APU off - Air Conditioning & Pressurization (Check on EICAS)

FL 100 / 10'000ft Flow during climb

PM: "FL 100 / 10'000ft"

PF: "Checked"

PM: External Lights (OFF) / Sterile Light

PM: "FSTN Belts?"

PF: "OFF/ON"

PF: MCDU (PROG) -> DEL hardtuned NAV frequen. & NAV page clear "Fix Info"

Approach Preperation

FRAMS

- FMS/MCDU, FPL

- Radios

- Autobrake

- Minimum

- Speeds

FL 100 / 10'000ft Flow during descent

PM: "FL 100 / 10'000ft"

PF: "Checked"

PM: External Lights (ON) / Sterile Light

(Altimeters have been set to QNH)

PF: "Approach Checklist" 

PM: "Pax Signs Panel - Set"

PM: "Altimeters"

PF: "Set" (QNH)

PM: "X-Checked", "Approach Checklist completed"

 

 

PF: "Before Landing Checklist"

PM: "Landing Gear?"

PF: "Down" - PM: "Down"

PM: "Slat/Flap?"

PF: "5 Set" / "Full Set" - PM: "5 Set" / "Full Set"

PM: "Before Landing Checklist completed"

After Landing Flow

LSP orders: "After Landing Sequence"

- RSP "APU?" -> OFF/ON/START

- External Lights

- Slat/Flap (0)

- Pitch/Trim (2.0 UP)

- Transponder (ALT-ON)

- DU4 (Status Page)

After 2min IDLE power

LPS orders: "Stop Engine 1 (2)"

Engine 1 first:

- Electric Hydraulic Pump 1 (ON)

- EICAS message "Hydraulic Pump not Auto"

- Start/Stop Selector 1 (STOP) "Engine 1 OFF"

- Start/Stop Selector 2 (STOP) "Engine 2 OFF"

Engine 2 first:

- Start/Stop Selector 2 (STOP) "Engine 2 OFF"

- Start/Stop Selector 1 (STOP) "Engine 1 OFF"

 

After both Engines have been shut down: Electric Hydraulic Pump 1 A

Shut Down Flow

- Transponder -> Set 2000 (STBY)

LSP oders: "Shutdown Checklist"

Study