PSPO I

Pasta e Basta

Pasta e Basta


Fichier Détails

Cartes-fiches 325
Utilisateurs 11
Langue Deutsch
Catégorie Technique
Niveau Autres
Crée / Actualisé 12.04.2022 / 25.12.2024
Lien de web
https://card2brain.ch/box/20220412_pspo_i
Intégrer
<iframe src="https://card2brain.ch/box/20220412_pspo_i/embed" width="780" height="150" scrolling="no" frameborder="0"></iframe>

During a Sprint Retrospective, for what is the Scrum Master responsible?

A Scrum Master is keeping a list of open impediments, but it is growing, and he/she has been able to resolve only a small portion of the impediments. Which technique would be most helpful in this situation?

Which of the following are true about the Product Owner role? Choose 3

When does the second Sprint start?

At the end of a Sprint a Product Backlog item worked on during the Sprint does not meet the Definition of Done. What two things should happen with the undone Product Backlog item?

Which of the following is required by Scrum?

Which three of the following are feedback loops in Scrum?

The Product Owner determines how many Product Backlog items the Developers select for a Sprint:

When can the Developers cancel a Sprint?

What are two responsibilities of testers in a Scrum Team?

When is a Sprint over?

What is the tactic a Scrum Master should use to divide a group of 100 people into multiple Scrum Teams?

When should a Sprint Goal be created?

Sprint burndown charts are an efficient tracking tool because they show:

Of the following choices, what is the most effective way a Scrum Master can keep the Developers working at its highest level of productivity?

Which three phrases best describe the purpose of a Definition of Done?

A Scrum Master is introducing Scrum to a new Scrum Team. The Developers have decided that a retrospective is unnecessary. What action should the Scrum Master take?

Every Scrum Team should have:

The Product Owner makes sure the team selects enough from the Product Backlog for a Sprint to satisfy the stakeholders.

What is the best Scrum Team structure to produce a fully integrated product?

A new developer has joined the existing Scrum team. He/she is having continuing conflicts with existing members and is making the environment hostile. If necessary, who is responsible for removing the new team member, and why?

The best describes the topics covered in Sprint Planning?

When may a Scrum Team change its engineering practices?

Which three of the following are true about Scrum?

What are the consequences if the team doesn’t have a consistent Definition of Done?

What is the commitment for the Scrum Team that is expected for the Sprint Backlog?

What is the commitment by the Scrum Team that is expected for the Increment?

The _______________________  is to the Product Backlog what a Sprint Goal is to Sprint Backlog.

The Developers need to answer the 3 questions at the Daily Scrum:

What is one way a Scrum Team can address non-functional requirements (NFRs) on a Scrum project?

The Scrum Team is continuously arguing about which with Agile Tool to use for requirements. What should the Scrum Master do to resolve the issue? (pick two)

After a backlog refinement meeting, the Developers complained that they don’t have the specialized skills to accomplish the upcoming work. What should be the Scrum Master’s approach to solving the problem?

The Developers no longer have to answer the same 3 questions every day during the Daily Scrum:

There are 3 topics covered in the Sprint Planning meeting. What questions are supposed to be addressed?

Which 3 topics are NOT covered in the Sprint Planning meeting.

There is only one increment per Sprint:

There can be multiple increments delivered per Sprint:

Who is responsible for creating the Definition of Done?

Which two criteria should always be part of the Definition of Done?

Which one is NOT a Pillar of Scrum?