ZHAW
Kartei Details
Karten | 92 |
---|---|
Sprache | English |
Kategorie | Englisch |
Stufe | Universität |
Erstellt / Aktualisiert | 02.03.2021 / 16.07.2023 |
Weblink |
https://card2brain.ch/box/20210302_business_english_busea1
|
Einbinden |
<iframe src="https://card2brain.ch/box/20210302_business_english_busea1/embed" width="780" height="150" scrolling="no" frameborder="0"></iframe>
|
Relieve / make something less severe
Alleviate (erleichtern)
Stop
Cease
Come from
Emanate
Improve
Enhance
Inform
Influence / affect
Happen
Occur
Begin something new or difficult
Embark
Ask for
Solicit
Increase suddenly
Surge
Do lot of business / be successful
Thrive
Engpass
bottleneck
Durchlauf
throughput
Kapazitätsauslastung
capacity utilization
Gebrauchstauglich
fit-for-purpose
Preis/Leistung
value-for-money
Zuverlässigkeit
reliability
Langlebigkeit
durability
Defekt
defect
Key stages of the manufacturing process
Planning
Sequencing
Scheduling
Dispatching
Loading
Monotoring
Planen - was beinhaltet der Schritt
Planning
bring together costumer demand with operational issues of volume, timing, and purchase of materials
Ablaufplanung - beinhaltet was?
sequencing
decide which workstation will carry out which tasks in which order
Terminplanung - beinhaltet was?
scheduling
when tasks start and finish
Abwicklung - beinhaltet was?
dispatching
authorize tasks to begin (detailed instruction)
Beauftragung / Beladen - beinhaltet was?
loading
material are introduced to an operation so it can begin
Bewachung / Überwachung - beinhaltet was?
monitoring
checking progress, eliminating bottlenecks, identifying and solving problems
schlank
lean (positiv in a business way)
Kapitalintensiv
capital-intensive
Arbeitsintensiv
labour-intensive
laufende Erzeugnisse/Arbeit
work-in-progress WIP
Durchlaufmenge
throughput
Kapazitätsauslastung
capacity utilization
gerade zu rechten Zeit (Technik)
Was beinhaltet diese Technik?
just-in-time JIT
eliminate waste
developing practices to contiuous improvement (kaizen)
involving staff
improving WIP
reducing set-up and change-over times (Einricht und Umrüstzeit)
reducing costs by reducing design compexity
Preis-Leistungs-Verhältnis
value-for-money
Funktionalität
functionality
Aussehen
appearance
Zuverlässigkeit
reliability
Haltbarkeit
durability
einfache Behebung von Problemen
ease of recovery from problems
Kontakt mit Firma
contact with company
Qualitätssicherung
quality assurance