V02 Service Provision

- Service model as guiding principles of the design and building process

- Service model as guiding principles of the design and building process


Kartei Details

Karten 15
Sprache Deutsch
Kategorie Berufskunde
Stufe Universität
Erstellt / Aktualisiert 07.01.2020 / 28.01.2020
Weblink
https://card2brain.ch/box/20200107_v02_service_provision
Einbinden
<iframe src="https://card2brain.ch/box/20200107_v02_service_provision/embed" width="780" height="150" scrolling="no" frameborder="0"></iframe>

What are the two duties of consultants according to SIA? What is the big difference between the service of a consultant and a service of work?

  • Duty of loyality (Treuepflicht): "They shall be independent of contractors and suppliers"
  • Duty of diligence (Sorgfaltspflicht): "They shall act responsibility towards the environment and the public"

Consultant: Delivers intellectual service, with an unknown output.

Work: Delivers a product whith a clear predefined outcome. 

Define a Project.

  • Clear defined starting- and endpoint
  • outcome is unknown and unique

Draw the swiss service model for a leading consultant and highlight the basic services according to SIA.

  • Strategic briefing
  • Plreliminary Studies
  • Project*
  • Invitation to tender (Ausschreibung)*
  • Implementation*
  • Operation

*Basic services

What are the differences between the Swiss and German Service model?

Swiss:

  • Division in "Phases"
  • Only a recommendation
  • non-compulory phases like "strategic breefing", "pleliminary studies", "Operation"

German:

  • Division in "Working Packages"
  • Every working package belongs to the basic service. -> leading consultant must do everything. 

Name the Subphases of "Strategic Planning" and its goals.

  • Definition of needs, solution strategies.

Goal: Determination of of needs, solution strategies

Name the Subphases of "Preliminary Studies" and its goals.

  • Project definition, feasibility study (Machbarkeitsstudie)
  • Selection procedures: Select the option which meets the requirements best.

Name the Subphases of "Project" and its goals.

  • Preliminary project: Concept and profitability optimized
  • Construction project: Project and cost optimized, defined
  • Permit-abtaining procedure:

Name the Subphases of "Intivation to bid / tender" and its goals.

  • Invitation, comparison of quotation, application for contract awarding

 

Name the Subphases of "Implementation" and its goals.

  • Construction project
  • Implementation
  • Commissioning (Inbetriebnahme), completion

Name the Subphases of "Management" and its goals.

  • Operation
  • Review / Monitoring / Control
  • Maintenance

A feasibility study should consider 3 different aspects of "feasibility". Name them.

  • Economic
  • social
  • environment

 

Who makes the decisions at the end of very subphase in the Swiss Service Model? What's the role of the leading consultant?

  • Client decides in the end
  • but the leading consultant has to give advie! 

Note: Every backstep after a phase is closed is can be charged as "Mehraufwand"

In which phase does the construction management enter the service model?

  • Phase 4: Invitation to bid / tender

Name the SIA regulation recommending the services and fees for

1. Architects
2. Structural Engineers
3. Building System Engineers

1. SIA 102
2. SIA 203
3. SIA 108

How are the subphases called in SIA 102, 103, 108?

Project:

  • Schematic design (Preliminary Project)
  • Design Development (Construction project)
  • Building permit process

Invitation to tender:

  • Recommendation for contract

Construction:

  • Construction Project
  • Construction
  • Commissioning, Completion