KPI : key performance indicators

How effectively a company is performing
(input: what is needed to produce)
(ouput: what is produced)
(hardship factors: beyond the controll of the PM)

Important components for a successful project

-cost
-time
-profitability
-Safety
-Quality
-Participant's satisfication
-User's satisfication

ECT: estimated cost to complete

 

EAC

original: ECT = BAC - BCWP
deviation accounted: ECT = (BAC -BCWP)/CPI

EAC: estimate at completion
EAC = ACWP + ECT = BAC - CV

(Critics  of the earned value analysis)

-No differentiation between critical & non-critical-path

-A lot of informations needed

-difficult to track everything on site

Cost of quality

Cost of good qualtiy: Appraisal costs
                                  Prevention costs

 

Cost of poor quality: External & internal failure costs

Proces for risk management

1. Identify risk (positive or negative) and document their characteristics

2. Assess risk (beurteile risiko)

3. Rank risk (qualitativ & quantitative)

4. develop a strategy

(5. monitor and controll risk)

#1 rule on construction site

 

When is the best time to make changes:

Safety

 

In the planning phase

What is the most important part of the final report?

lessons learned

What is the general process for a project closeout

1. Project closeout
2. Client closeout
3. Organizational closeout
4. Write the final report
5. Team closeout

What is the usual stakeholder management procedure?

1. Identify stakeholders
2. Plan communication
3. Distribute informations
4. Manage expectations
5. Report performance

4 Main factors which affect the decision style:

trust

quality

time constraints

acceptance

Project closeout:

Client closeout:

Organizational closeout:

Final report
Team closeout..

Project closeout: all works should be completed ( create documentation that everything is complete or what is missing

Client closeout: Verify the acceptance from the client

Organizational closeout: demobilization company & stuff

Final report: enthält: problems, lessons learned, experiences--> used for furthe improvement
Team closeout..

Stakeholder definition

Person or entity which is affected or involved in the project (interest and influence on the outcome)

Power interest Matrix

Interpersonal skills of a project manager (7)

1. team building 
2. Motivation
3. Communication: giving information but also listening
4. Influence:  (to get cooperation of the whole team) 
5. Decision-making: auch schnelle Enztscheidungen
6. Political and cultural awareness (speziell verschiedene Kulturen)
7. Negotiation (geschickt verhandeln)

Lean construction (definition)

 

two concepts

Design product system so to minimize waste (material, time effort) and maximize the earned value

Just in time: just produce what is needed
Automation with a human touch: Wenn es ein Problem mit der Anlage gibt wird diese sofort gestoppt und der Mensch übernimmt (so gibt es keine Fehlproduktion)

Agile project management

Flexible react to changes and uncertainities in a unpredicatable environment. Good & direct communication

5 iterative steps to generate value:

 

1. Identify customer and specify the value from their point (Was ist ihnen wichtig)

2.Identify & observe value stream

3.eliminate steps which dont create value (less waste &interruptions in production process)

4. Just produce if the customer is ordering something

5. Repeat 1-4 until there's no waste

5S-Technique

Sort: sorting out all not needed items

Straighten: put all needed items at the right position

Shine: Clean & inspect the workplace/items/tools/machinery often

Standardize: standardiesieren der ersten 3

Sustain: erhaltung der ersten Vier

5-Why-technique

Often ask 5 times why is enough to find the root of a problem

(Principles for a good lean construction)

-Improve communication
                collaboration
-Eliminate waster & error
-Agile PM
-Clean and safe work environment

Form of waste
 

Everything for what the customer isnt willing to pay
-time
-material
-Overproduction
-Inventory
-Rework & corrections
-Staff downtime
-Transport

Lean project delivery system:

Last planner system

 

1. Master schedule with milestones/key dates
2. Schedule of predefined phases
3.Look ahead plan: to see problems and solve them before they've negative consequences
4.Weekly workplan: In interaction with different contractors in site
4. Progress tracking: for feedback &learning

Agile loop (6 elements)

Critical step last planner system

To feedback the information from the lookaheads to the master schedule

4D

5D

3D + time

4D + cost

Typical construction waste???

a. wages            b.rework&corrections                   c. unnecessary meetings with client
d. CO2-Emission   e. Spare oil & and Gasoline     f. Inventory
g. Returns              h. Transport                             i. Littering
j. staff downtime     k. Time                                    l. Money
m. food waste         n. overproduction

b.rework&corrections                  
f. Inventory
h. Transport                             
j. staff downtime     
k. Time
n. overproduction

(Functions of a PM)

-Effective Communication between everybody
-Specify the project objectives
-Balancing the project constraints
-Proper coordination during entire process
-Maximize ressource efficency

(Main skills of a project manager)

Leadership
Communication
Negotiation
Human relations
Scheduling
Technical Know-how
Quality-management
Risk-Management
Budgeting

Project phases

1. Strategie planning           -->definition needs goals...
2. Preliminary studies         -->feasiability?abschätzen der Kosten
3. Project development       -->konzept, optimieren
4.Inivitation to bid
5. Cnstruction / Implementation(Umsetzung)
6.Managment                       --> Operation, Maintenance

Building lifecycle

Initiatin-Development-Realization-Usage-Rebuilt-

triple constraint

Input/Output:                 scope time cost

Process                         Risk          Ressources            Quality

NTP: Notice to proceed

tender:

BOQ

-letter from a client that the contractor can start with the work on a certain day

-Person/entity who give a bid for a certain work

-Bill of quantity

Freeze document

 

WBS

 

-Nutzungsvereinbarung

-WBS: Work breakdown structure

 

Organizational structures (3 types)

In Matrix hat man 2 Bosse

WBS = ....
 

WBS = PBS + ABS

work breakdown structure = project breakdown structure + activity breakdown structure

EHS stand for what?

Environment

Health

Safety

2 main delay categories:

Exusable

Non-excusable