Lernkarten

Marco Wernli
Karten 85 Karten
Lernende 6 Lernende
Sprache English
Stufe Universität
Erstellt / Aktualisiert 09.06.2020 / 17.06.2020
Lizenzierung Keine Angabe
Weblink
Einbinden
0 Exakte Antworten 1 Text Antworten 84 Multiple Choice Antworten
Fenster schliessen

Element of the EPC (event-driven process chain): Are displayed as hexagons.

Connections

Events

Operators

Functions

Fenster schliessen

Element of the EPC (event-driven process chain): Are displayed as circles.

Connections

Events

Operators

Functions

Fenster schliessen

Element of the EPC (event-driven process chain): Are displayed as rectangles with rounded corners.

Connections

Events

Operators

Functions

Fenster schliessen

Which statements about "Pools" and "Swimlanes" in BPMN (Business Process Model and Notation) are correct?

 
Interaction between swimlanes is represented by "message flows"

The sequence flow can exceed the limits of swimlanes.

Pools stand for independent participants in a business model.

Each pool has its own process, i.e. a process is entirely within a pool.

Fenster schliessen

Element of the BPMN (Business Process Model and Notation): Assigns the activities to the areas of responsibilities or competences.

Pool and Swimlane

Gateway

Event

Activity

Fenster schliessen

Element of the BPMN (Business Process Model and Notation): Controls the process flows.

Pool and Swimlane

Gateway

Event

Activity

Fenster schliessen

Element of the BPMN (Business Process Model and Notation): A process starts and ends with ...

Pool and Swimlane

Gateway

Event

Activity

Fenster schliessen

Element of the BPMN (Business Process Model and Notation): Describes a task or a step.

Pool and Swimlane

Gateway

Event

Activity