Change - timing of different aspects
- The greater the degree of change needed, the more it may be useful to build on actual or perceived crisis. If members of the organization perceive a higher risk in maintaining the status quo than in changing it, they are more likely to change.
- Windows of opportunity such as
- New owners
- New executive
- Arrival of a major competitive threat
- The timing of job losses is very important. Should be done before the change program, so the change itself doesn’t get associated with something negative. Can be a good chance to remove people who are against change.
- There should be a caring approach to those who lose their jobs to show the remaining employees that the organization cares.
Business Process Re-engineering (BPR) - definitions (2)
Re-engineering is a radical or break-through change in the business process. Re-engineering seeks dramatic orders of magnitude as distinguished from incremental improvement in business value.
Key value creation processes involving manufacturing operations include order fulfillment (the customer supply chain process), product development, order creation (selling and configuration) and customer service (post-product delivery processes). (Nixon et at)
Re-engineering is the fundamental re-thinking and radical redesign of business processes to achieve dramatic improvements in critical, contemporary measures of performance, such as cost, quality, service. (Hammer and Champy)
Total Quality Management (TQM) - definition and 2 basic strands to quality
TQM is meant to be a long term process striving for continuous improvement in every part of the organization and not just manufacturing mistakes.
All parts of the organization should consider themselves both customers and suppliers of goods and services, creating customer chains within the organization, as product flow through that organization.
Two basic strands to quality:
- Meeting customer requirements
- Conformance specification
TQM vs. Re-engeneering
TQM has been traditionally associated with continual incremental improvement, whereas BPR envisages radical change or a root and branch reform:
“It means starting all over again, starting from scratch with a clean sheet of paper BPR is directed at a big bang improvement”
Functional stupidity - description
- inability and/or unwillingness to use cognitive and reflective capacities in anything other than narrow and circumspect ways.
- lack of reflexivity, a disinclination to require or provide justification, and avoidance of substantive reasoning.
- elements of cognition, motivation, and emotion.
Coping with change (De Vries and Miller)
Stage 1: Denial (‘We have always done things this way, Why change
we are making a profit, aren’t we?’)
Stage 2: Defence. Earlier discussion leads to concrete programmes and plans of change.
Stage 3: Discarding. Initially a process of perception. People come to see that the change is both inevitable and/or necessary.
Stage 4: Adaptation. Rarely do new systems, procedures, structures or machines work effectively first time. Trial and error.
Stage 5: Internalization. Now the people involved have created a new system, process and organization.
Cluster - Definition
A cluster is a concentration or group of businesses and institutions that interact in the same industry or value system, which are geographically close, generating formal and informal relations that can be spontaneous or deliberate, and therefore contributing to a collective efficiency
Communities of Practice - Definition
A community of practice (CP) is a structure through which knowledge is created, transferred and generalized among its members in a first step and then, once the management validates this knowledge, it can be transferred to the entire organization.
CP Life Cycle
the potential stage refers to the benefit of sharing basic practices when having common interests
• coalition stage: greater willingness to generate and sharing knowledge, since the community finds and recognizes the expertise and up to this point it defines common practices, beginning the generation of knowledge
• active stage: members develop commitment and obligations through the systematic action towards the generation of knowledge, and start to add value to the organization
• stage of scatter the CP is already a major center for sharing and generating knowledge, contacts and meetings
• memorable stage where the community has lost relevance for its members