Premium Partner

Manufacturing Process Improvement

356EM Coventry University

356EM Coventry University


Kartei Details

Karten 51
Sprache English
Kategorie Technik
Stufe Universität
Erstellt / Aktualisiert 26.04.2016 / 26.04.2016
Lizenzierung Keine Angabe
Weblink
https://card2brain.ch/box/manufacturing_process_improvement
Einbinden
<iframe src="https://card2brain.ch/box/manufacturing_process_improvement/embed" width="780" height="150" scrolling="no" frameborder="0"></iframe>

Availability Loss 1

Breakdown: Due to failures and repairs being carried out

Availability Loss 2

Set-up / Adjustment: Due to changing batches of product type

Performance Loss 1

Idling / Minor stoppage: Due to waiting for material/parts to arrive

Performance Loss 2

Speed: Machine not operating at optimum cycle time due to faults

Quality Loss 1

Scrap / Rework: Quality defects due to process capability problems

Quality Loss 2

Start-up: Due to process taking time to stabilise before achieving capable production

What is Loss?

Everything that prevents effective operation caused by faults and problems

The 6 Big Losses?

  1. Breakdown
  2. Set-up / Adjustment
  3. Idling / Minor stoppage
  4. Speed
  5. Scrap / Rework
  6. Start-up