Manufacturing Process Improvement
356EM Coventry University
356EM Coventry University
51
0.0 (0)
Kartei Details
Karten | 51 |
---|---|
Sprache | English |
Kategorie | Technik |
Stufe | Universität |
Erstellt / Aktualisiert | 26.04.2016 / 26.04.2016 |
Lizenzierung | Keine Angabe |
Weblink |
https://card2brain.ch/box/manufacturing_process_improvement
|
Einbinden |
<iframe src="https://card2brain.ch/box/manufacturing_process_improvement/embed" width="780" height="150" scrolling="no" frameborder="0"></iframe>
|
Availability Loss 1
Breakdown: Due to failures and repairs being carried out
Availability Loss 2
Set-up / Adjustment: Due to changing batches of product type
Performance Loss 1
Idling / Minor stoppage: Due to waiting for material/parts to arrive
Performance Loss 2
Speed: Machine not operating at optimum cycle time due to faults
Quality Loss 1
Scrap / Rework: Quality defects due to process capability problems
Quality Loss 2
Start-up: Due to process taking time to stabilise before achieving capable production
What is Loss?
Everything that prevents effective operation caused by faults and problems
The 6 Big Losses?
- Breakdown
- Set-up / Adjustment
- Idling / Minor stoppage
- Speed
- Scrap / Rework
- Start-up