Premium Partner

ITM750_Chap05_

d

d

Nicht sichtbar

Nicht sichtbar

Kartei Details

Karten 18
Sprache English
Kategorie BWL
Stufe Universität
Erstellt / Aktualisiert 07.12.2013 / 28.09.2019
Lizenzierung Kein Urheberrechtsschutz (CC0)
Weblink
https://card2brain.ch/box/itm750chap05
Einbinden
<iframe src="https://card2brain.ch/box/itm750chap05/embed" width="780" height="150" scrolling="no" frameborder="0"></iframe>
Scope

Refers to all the work involved in creating the products of the project and the processes to create them

Deliverable

Describes a product produced as part of a project

Project scope management

Processes involved in defining and controlling what work is or is not included in a project

Requirement

Condition or capability that must be met or possessed by a system to satisfy a contract, standard or specification

Requirements management plan

Describes how project requirements will be analyzed, documented and managed

Requirements traceability matrix (RTM)

Table that lists requirements, various attributes of each requirement, and the status of the requirements to ensure that all requirements are addressed

Work Breakdown Structure(WBS)

Deliverable-oriented grouping of work involved in a project that defines the total scope of the project

decomposition

Subdividing project deliverables into smaller pieces